
Bathroom remodeling in St. Petersburg & Tampa
Showers, tubs, vanities and tile handled by one contractor. The part you cannot see — the waterproofing behind the tile — is the part we are most particular about.
- Fixed written pricing
- 2–3 week typical build
- Financing from $199/mo
- Workmanship warranty
Price my bathroom
Call and we will bring tile and fixture samples to your bathroom.
Mon–Fri 9am–6pm · speak to the team direct
What happens when you call
- A few questions about the room and your timeline
- A free in-home visit, usually the same week
- A fixed written price — no pressure, no obligation
One bathroom, or every bathroom in the house
- Walk-In ShowersCurbless and low-threshold showers, waterproofed properly and tiled to the ceiling.Learn more
- Tub-to-Shower ConversionSwap an unused tub for a shower you will actually use, usually within a week.Learn more
- Bathtub ReplacementLike-for-like swaps and freestanding installs, including surround and valve work.Learn more
- Vanities & CabinetsSingle and double vanities, linen towers and storage sized to the room.Learn more
- Bathroom TileFloors, wet walls and feature niches, set on a properly prepared substrate.Learn more
- Accessible BathroomsCurbless entries, grab-bar blocking and comfort-height fixtures, done discreetly.Learn more
Bathrooms that hold up to Florida humidity
A bathroom is the smallest room in the house and the easiest one to get wrong. Most of the failures we are called in to fix trace back to waterproofing that was rushed or skipped.
- Full waterproofing membraneBonded membrane behind every tiled wet wall, not just a coat of sealer.
- One crew, start to finishThe same team from demo to the final bead of silicone, not a rotation of subs.
- Built for how you will use it laterBlocking for future grab bars costs almost nothing to add now.



Bathroom clients, in their words
- Google
They gutted our 1960s kitchen and had us cooking again in three weeks. The crew showed up on time every single day and the cabinet work is flawless.
Danielle R. - Google
We converted a cramped tub into a walk-in shower for my mother. The tile work is beautiful, they were tidy every single day, and the price never moved from the quote.
Marcus T. - Google
New luxury vinyl plank through the whole downstairs. Careful with the furniture, spotless at the end of each day, and the transitions look factory-perfect.
Priya N.
Bathroom Remodeling FAQ
A single bathroom is typically two to three weeks on site once materials are in hand. A tub-to-shower conversion on its own is usually finished inside a week.
A straight tub-to-shower conversion is the least expensive way to change a bathroom meaningfully. Full remodels with new tile, vanity, fixtures and layout changes cost more. Your written estimate lists every line so nothing moves later.
Yes, though relocating drains means opening the slab or the floor structure, which affects both cost and schedule. We will tell you at the estimate which changes are cheap and which are not.
We do — curbless showers, comfort-height fixtures, reinforced walls for grab bars, and wider door openings where the framing allows.
Only if it is the only bathroom in the house. Where there is a second bathroom we sequence the work so one stays usable throughout.
Talk to a bathroom designer
We answer scope and budget questions before you commit to anything.
Mon–Fri 9am–6pm · speak to the team direct
What happens when you call
- A few questions about the room and your timeline
- A free in-home visit, usually the same week
- A fixed written price — no pressure, no obligation
Your new bathroom starts with one visit
Serving St. Petersburg, Tampa, Clearwater, Largo and the surrounding Bay area. Monday through Friday, 9am to 6pm.

